 |


|  |
More powerful engine for LEIPA in Schwedt 07.09.2011 On 25.08.2011 at 1.00 o’clock in the morning arrived the "new" engine for the LEIPA Logistik GmbH in Schwedt. Due to the increased rail shipping and receiving volumes it was necessary to create a more powerful locomotive.


|
 |



|
|
|